
Maracajaú - Rio Grande do Norte - Brazil |
|
When the dream of a holiday home on the other side of the world turns into reality
|
|
Construction of the resort of Porto dos Corais has been through several delays and is currently expected to be fully completed during 2012. The first phase of houses R, S and T is finished in 2009 and delivery has started. A, B and C houses are continually finish during 2010, after which power addresses to further development and completion of the D apartments. The last phase of construction is the building of 5 blocks E-I and the completion of the entire infrastructure with roads and recreational area. |
|
B houses B houses are the 19 largest housing as the dwelling is 119 m2 divided on two floors. B houses has on ground floor; kitchen with dining area, bedroom with air conditioning, bathroom and living room with exit to the terrace and at 1. floor; two bedrooms with air conditioning, bathroom and living room with outlet to the large balcony, from which there is a sea view. |

|
All photos are from 2/7 2009 - 28/1 2010 |