Maracajaú - Rio Grande do Norte - Brazil

When the dream of a holiday home on the other side of the world turns into reality

 

                                                                                                                                                                                                                                                                                                                                                      

             Construction of the resort of Porto dos Corais has been through several delays and is currently expected to be fully completed

             during 2012. The first phase of houses R, S and T is finished in 2009 and delivery has started.  A, B and C houses are continually

             finish during 2010, after which power addresses to further development and completion of the D apartments. The last phase of

             construction is the building of 5 blocks E-I and the completion of the entire infrastructure with roads and recreational area.

B houses

B houses are the 19 largest housing as the dwelling is

119 m2 divided on two floors. B houses has on ground floor; kitchen with dining area, bedroom with air conditioning, bathroom and living room with exit to the terrace and at 1. floor; two bedrooms with air conditioning, bathroom and living room with outlet to the large balcony, from which there is a sea view.
B houses are all undisturbed on the outside of leisure areas, so they appeals both to those who want undisturbed privacy on the balcony, with the spectacular view and to those who want to be part of the social life in the resort.

Text Box:

 

 

                                                               All photos are from 2/7 2009 - 28/1 2010